Powered By Kitlog Pro v2.0
The Tichawa RV-7A Project
Builder:
John Tichawa
Location:
Genoa, IL - USA
Aircraft:
Van's Aircraft, Inc. - RV-7A
Manufacturer:
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
346 Hours
WELCOME TO THE JOHN TICHAWA AND SON RV-7A WEBSITE.
Recent Activity
Date
Hours
Work Log Summary
Details
01-24-2007
3.0
Access Covet
Details
01-24-2007
3.0
Access Cover
Details
01-19-2007
5.0
Dimplidg
Details
01-14-2007
12.0
Right Wing
Details
10-15-2006
5.0
Right Fyel Tank
10-14-2006
5.0
Right Fuel Tank
09-30-2006
5.0
Right Winsg Skins
09-27-2006
3.0
Set And Drilled Joint Plate Right Wing
09-21-2006
4.0
Right Leading Edge
09-19-2006
6.0
Right Wing Skins Drilled
SITE NAVIGATION
Contact Builder
FORMULA Home
RV-7A Home
Category
# Logs
# Hours
All
91
354
Both Elevators
4
18
Empennage
1
5
Empennage Fiberglass
1
25
Horizontal Stabilizer
14
64
KitLog
4
15
Main Spar Assy
1
1
Rudder
11
31
Shop
2
11
Tools
2
2
Vertical Stabilizer
8
24
Wings
43
158
Copyright © 2001-2024 Matronics. All Rights Reserved.