KitLog pro

Powered By Kitlog Pro v2.0

Ky Bearhawk Construction site

Builder:
Doug Carter
Location:
Eubank, Ky - USA
Aircraft:
R&B Aircraft - Bearhawk
Engine:
TBD -
Prop:
TBD
Total Build Time:
465 Hours

Welcome to the construction log for the KY Bearhawk. This is my site on the plans built construction of a Bob Barrows Bearhawk. This picture is of a Canadian bearhawk on floats. I plan on making the recommended modifications to mine to allow it to accommodate amphib floats.

Recent Activity
 Date Hours Work Log Summary Details
 03-16-2015
2.0
Riveted Fairleads, Wiring Conduit In Place
Details
     

 11-30-2014
1.5
Cable Routing
Details
       

 11-29-2014
1.5
Fairlead Installation
Details
       

 09-21-2014
1.0
Aileron Cable Routing
Details
       

 09-18-2014
0.5
Second Coat And The Metal Arrives
Details

 09-17-2014
1.0
Fairlead Guides
Details
       

 09-16-2014
1.0
Aileron Bellcranks And Outer Hinges
Details

 09-15-2014
1.5
Pulley Brackets And Flap Push Rods
Details
       

 09-14-2014
2.0
Mounted Flap Drives
Details
       

 09-13-2014
2.0
A Little Painting And Aileron Bell Crank Calculati
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.