KitLog pro

Powered By Kitlog Pro v2.0

Eric Newton Patrol Site

Builder:
Eric Newton
Location:
Long Beach, MS - USA
Aircraft:
Newton - Bearhawk Patrol
Engine:
Barrows - O-360 XP
Prop:
-
Total Build Time:
44 Hours

Please visit my main website for the Patrol build here:
http://mybearhawkpatrol.com

I am using Kitlog to track my hours.

Recent Activity
 Date Hours Work Log Summary Details
 08-05-2010
1.0
Installing Inspection Covers

 08-02-2010
2.0
Inspection Covers
Details

 08-01-2010
3.0
Inspection Covers
Details
       

 07-31-2010
4.0
Finished Installing Fuel Tank Cover
Details
       

 07-27-2010
3.0
Finished Installing Tank Cover Anchor Nuts
Details
       

 07-25-2010
5.0
Installing Anchor Nuts For Fuel Tank Cover
       

 07-18-2010
6.0
Riveting Bottom Skin In Place
Details
       

 07-17-2010
5.0
Running Aileron Cable Route
Details
       

 07-17-2010
1.0
Installing Flap Drive And Springs
       

 07-15-2010
2.0
Fabricating Pulley Cable Guards
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.