KitLog pro

Powered By Kitlog Pro v2.0

Steve Zelenys RV-7

Builder:
Steven Zeleny
Location:
Kamloops, BC - Canada
Aircraft:
Vans Aircraft - RV-7
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
68 Hours

Welcome to my Experimental Aircraft Web Site.

Recent Activity
 Date Hours Work Log Summary Details
 06-30-2010
4.0
Riveting The Elevator
Details
       

 06-27-2010
5.0
Preparing The R/H Elevator Parts
Details
       

 06-19-2010
2.5
Riveting The Rudder.
Details
 

 06-13-2010
6.0
Riveting The Stiffeners
Details
       

 06-05-2010
3.5

Details
       

 06-02-2010
2.5
Preparing The Rudder Skin Stiffeners
Details
       

 06-01-2010
2.0
Dimpling Tool
Details
       

 05-30-2010
3.0
Vertical Stabilizer Rear Spar
Details
       

 05-25-2010
1.0
De-burring
Details
       

 05-09-2010
2.3
Beginning The Horizontal Stabilizer.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.