Powered By Kitlog Pro v2.0
Steve Zelenys RV-7
Builder:
Steven Zeleny
Location:
Kamloops, BC - Canada
Aircraft:
Vans Aircraft - RV-7
Manufacturer:
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
68 Hours
Welcome to my Experimental Aircraft Web Site.
Recent Activity
Date
Hours
Work Log Summary
Details
06-30-2010
4.0
Riveting The Elevator
Details
06-27-2010
5.0
Preparing The R/H Elevator Parts
Details
06-19-2010
2.5
Riveting The Rudder.
Details
06-13-2010
6.0
Riveting The Stiffeners
Details
06-05-2010
3.5
Details
06-02-2010
2.5
Preparing The Rudder Skin Stiffeners
Details
06-01-2010
2.0
Dimpling Tool
Details
05-30-2010
3.0
Vertical Stabilizer Rear Spar
Details
05-25-2010
1.0
De-burring
Details
05-09-2010
2.3
Beginning The Horizontal Stabilizer.
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
27
81
Emp. R/H Elevator
2
9
Emp. Rudder
4
14
Horizontal Stab.
9
23
Preparation
4
13
Rudder
4
14
Vertical Stabilizer
4
8
Copyright © 2001-2024 Matronics. All Rights Reserved.