KitLog pro

Powered By Kitlog Pro v2.0

N19MM Contruction Log

Builder:
Corey Crawford
Location:
Wheat Ridge, CO - USA
Aircraft:
Van's Aircraft - RV-7A
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
83 Hours

Welcome to my experimental, amateur-built aircraft construction log. Here I document the construction of N19MM, a Van's Aircraft RV-7A.

(Pictured: Roberta Hegy's RV-7A)

Recent Activity
 Date Hours Work Log Summary Details
 07-04-2006
1.5
Rudder Steps 43 - 44: Riveting The Leading Edge
Details
       

 06-29-2006
1.0
Rudder Step 40 - 42: Finished Trailing Edge
Details
     

 06-28-2006
3.0
Rudder Steps 32 - 42: Rivet The Trailing Edge
Details
       

 06-27-2006
2.0
Rudder Step 31: Rivet Skins To Skeleton
Details
     

 06-26-2006
7.0
Rudder Steps 22-30: Finish Assembly Of Skeleton
Details
       

 06-25-2006
5.0
Rudder Steps 19 - 22: Prepare Skeleton For Assembl
Details
     

 06-19-2006
1.8
Rudder Steps 17 - 18: Match Drill Skins
Details
       

 06-16-2006
1.4
Rudder Steps 9 - 16: Rudder Skeleton
Details
     

 06-15-2006
1.5
Rudder Step 7: Stiffeners On Rudder Skins
Details
     

 06-10-2006
1.0
Rudder Step 7: Stiffeners On Rudder Skins
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.