Powered By Kitlog Pro v2.0
N19MM Contruction Log
Builder:
Corey Crawford
Location:
Wheat Ridge, CO - USA
Aircraft:
Van's Aircraft - RV-7A
Manufacturer:
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
83 Hours
Welcome to my experimental, amateur-built aircraft construction log. Here I document the construction of N19MM, a Van's Aircraft RV-7A.
(Pictured: Roberta Hegy's RV-7A)
Recent Activity
Date
Hours
Work Log Summary
Details
07-04-2006
1.5
Rudder Steps 43 - 44: Riveting The Leading Edge
Details
06-29-2006
1.0
Rudder Step 40 - 42: Finished Trailing Edge
Details
06-28-2006
3.0
Rudder Steps 32 - 42: Rivet The Trailing Edge
Details
06-27-2006
2.0
Rudder Step 31: Rivet Skins To Skeleton
Details
06-26-2006
7.0
Rudder Steps 22-30: Finish Assembly Of Skeleton
Details
06-25-2006
5.0
Rudder Steps 19 - 22: Prepare Skeleton For Assembl
Details
06-19-2006
1.8
Rudder Steps 17 - 18: Match Drill Skins
Details
06-16-2006
1.4
Rudder Steps 9 - 16: Rudder Skeleton
Details
06-15-2006
1.5
Rudder Step 7: Stiffeners On Rudder Skins
Details
06-10-2006
1.0
Rudder Step 7: Stiffeners On Rudder Skins
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
46
83
Empennage
38
70
Tools
2
2
Training Kit
6
11
Copyright © 2001-2024 Matronics. All Rights Reserved.