KitLog pro

Powered By Kitlog Pro v2.0

Barrys RV-9A Project

Builder:
Barry Jespersen
Location:
Olympia, WA - US
Aircraft:
Vans - RV-9A
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Lycoming - 0-360
Prop:
Sensinich - 72FM8 - Constant Pitch
Total Build Time:
1646 Hours

I will be building a Vans RV-9A quick build kit. I never thought I would have the time or resources to be able to do this, but I made it happen. I am planning on a 2-3 year build time. I look forward to someday having a finished plane, but will hopefully enjoy the building process along the way.

Recent Activity
 Date Hours Work Log Summary Details
 05-11-2013
6.0
Calibrated Fuel Tanks On EFIS. First Engine Start.

 05-10-2013
1.8
Flew With Mike Seager For Transition Training.

 04-28-2013
2.5
Finished Installing Interior.

 04-27-2013
8.0
Finished Installing The Interior. Weighed The Plan

 04-23-2013
2.5
Installed Interior.

 04-19-2013
2.0
Modified Cover Panel Around Elevator Trim Cable. C

 04-15-2013
1.8
Installed More Interior.

 04-14-2013
2.5
Started Final Assembly.

 04-13-2013
4.0
Misc. Work.

 04-12-2013
2.0
Finished Installing Plenum And Baffling.










Copyright © 2001-2024 Matronics. All Rights Reserved.