KitLog pro

Powered By Kitlog Pro v2.0

Sonex #1354

Builder:
Mark Campagna
Location:
Garland, Tx - USA
Aircraft:
Sonex - Sonex
Manufacturer:   
http://www.sonexaircraft.com/
Engine:
AeroConversions - AeroVee 2.1
Prop:
Sensenich - W54JV5L-44G - Constant Pitch
Total Build Time:
332 Hours

Current status: Working on wings. Making parts and rear spars, will then make ribs. I plan on purchasing the pre-made main spars, but must wait until after the first of the year (financing). Tail is complete, Horizontal and vertical stabs (save the fiberglass tips). I have fitted the tips and drilled them, but will wait until later to paint. I have also polished all of the aluminum surfaces.

Info:
First, My normal home page is http:campagna-family.net and I will continue to update and post information there, but I will document the build of my Sonex here as the posting and picture management is easier. This site is for documentation purposes only for the FAA and is not intended to represent Sonex Aircarft, LLC or best pratices on how to build an airplane.

Disclamier:
If you are going to build, FOLLOW THE PLANS. I take no responsibility if you use this information for your build project and all does not go well. (sad we have to put a disclaiimer in)

Recent Activity
 Date Hours Work Log Summary Details
 11-07-2010
4.0
Nose Ribs W15-##
Details
       

 10-24-2010
7.0
Nose Ribs W15-##
Details
       

 10-23-2010
5.0
Completed Aft Ribs, Started Nose Ribs
Details
       

 10-17-2010
2.0
Aft Ribs W16-02
Details
       

 10-16-2010
1.5
Aft Ribs W16-03
Details

 10-11-2010
3.0
Aft Wing Ribs W16-06 And -05
Details

 10-10-2010
4.5
Aft Wing Ribs
Details

 10-09-2010
1.5
Aft Wing Ribs W16-06
Details

 10-08-2010
4.0
Aft Wing Rib Assembly -04 Completed Plus 4 More Ri
Details
       

 10-07-2010
1.5
Aft Wing Rib Assembly -04
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.