Powered By Kitlog Pro v2.0
Scotts Kitfox Sport project
Builder:
Scott Miller
Location:
Tukwila, WA - United States
Aircraft:
Skystar - Kitfox Sport
Engine:
Rotax - 912ULS
Prop:
Sensenich
Total Build Time:
1145 Hours
Welcome to my Kitfox Sport builders log.
Recent Activity
Date
Hours
Work Log Summary
Details
06-27-2009
2.6
AOA Flap Position Micro Switch Installation.
Details
04-05-2009
1.2
Seat Pan Installation.
Details
04-04-2009
1.5
Pitch Trim Assist Installation
Details
04-04-2009
0.7
Cargo Bay Installation.
Details
03-29-2009
2.0
Autopilot Pitch Servo Pushrod Installation.
Details
03-24-2009
1.4
Static Port Installation.
Details
03-22-2009
1.7
Cabin Lighting Installation
Details
03-21-2009
3.3
Control Stick Wiring
Details
03-08-2009
3.5
Seat Support Strap Installation.
Details
01-25-2009
4.0
Altrak Autopilot Installation.
Details
SITE NAVIGATION
Contact Builder
Kitfox Sport Home
Category
# Logs
# Hours
All
429
1145
Avionics
14
31
Engine
29
33
Engine installation
4
7
Fabric covering
74
295
Final assembly
38
88
Fuselage
88
185
Horizontail Stabiliz
17
42
Landing gear
12
18
Miscellaneous
38
82
Paint
26
124
Prop
2
1
Strut Fairings
12
13
Wings
64
192
Wingtip
11
34
Copyright © 2001-2024 Matronics. All Rights Reserved.