KitLog pro

Powered By Kitlog Pro v2.0

Steves RV-12 Web Site

Builder:
Steve Mottin
Location:
Granbury, TEXAS - USA
Aircraft:
VANS - RV-9A
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
1024 Hours

Welcome to my Experimental Aircraft Web Site.

Recent Activity
 Date Hours Work Log Summary Details
 01-09-2005
2.0
Misc Fuselage Parts Priming
Details

 01-09-2005
1.5
Instrument Panel Frame Prep
Details

 01-08-2005
2.0
Instrument Panel Frame Prep
Details

 01-03-2005
5.5
Fuselage Skins Prep
Details

 01-03-2005
8.5
Bagga Area Prep
Details

 01-01-2005
4.5
Left Step Prep
Details

 12-31-2004
3.5
Right Step Prep
Details

 12-30-2004
7.8
Rear Top Skin Prep
Details

 12-29-2004
5.0
Misc Fuselage Work
Details

 12-19-2004
2.5
Seat And Fuselage Assembly
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.