KitLog pro

Powered By Kitlog Pro v2.0

ERIK'S WEB SITE

Builder:
Erik Heller
Location:
Winsted, CT - USA
Aircraft:
Van's Aircraft - RV-7
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
83 Hours

Welcome to my experimental aircraft Web site. I will be (slowly) building the Van's Aircraft RV-7.

Recent Activity
 Date Hours Work Log Summary Details
 04-04-2010
2.5
Polishing The Vertical Stabilizer
Details
       

 03-31-2010
0.5
Finishing The Vertical Stabilizer
Details
       

 03-19-2010
2.0
Finishing The Vertical Stabilizer
Details
       

 03-16-2010
1.5
Finishing The Vertical Stabilizer
Details
       

 03-15-2010
2.8
Finishing The Horizontal Stabilizer
Details
       

 03-14-2010
1.0
Drilling The Vertical Stabilizer
Details
       

 03-13-2010
2.0
Drilling The Vertical Stabilizer
Details
       

 03-10-2010
1.0
Drilling The Vertical Stabilizer
Details
       

 03-09-2010
1.0
Drilling The Vertical Stabilizer
Details
       

 03-08-2010
1.0
Drilling The Vertical Stabilizer
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.