KitLog pro

Powered By Kitlog Pro v2.0

LOU'S WEB SITE

Builder:
Lou Vencl
Location:
Stafford, VA - USA
Aircraft:
VANS - RV-7A
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
158 Hours

Vans RV7A
Canopy - slider
Engine: Probably 180Hp w/ constant speed prop
Avionics: EFIS w/ analog backup

Recent Activity
 Date Hours Work Log Summary Details
 01-21-2011
39.0
Preparing Vertical Stabilizer Spar
Details
       

 05-16-2010
2.5
Drilling The Vertical Stabilizer
Details
       

 11-08-2009
2.0
Primer Touch Up, Final Step For Horizontal Stablil
Details
       

 11-05-2009
0.5
Fixing Last Rivet On Tip Rib
Details
       

 10-30-2009
0.5
Horizontal Stabilizer Inspection
Details
     

 10-24-2009
6.0
Completing HS Forward Spar And Rib Riveting
Details
       

 10-22-2009
0.8
Finish Rivet Of Bottom Side Of Port Stabilizer
Details
       

 10-21-2009
1.5
Riveting Skins To Front Spar And Ribs H. Stab
Details
       

 10-17-2009
4.0
Attaching Forward Spar To Horizontal Stab
Details
       

 10-16-2009
3.0
Riveting The HS-707 Nose Rib
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.