Powered By Kitlog Pro v2.0
RV-7 Construction
Builder:
David Taylor
Location:
Warner Robins, GA - US
Aircraft:
Vans - RV-7
Manufacturer:
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
391 Hours
Welcome to my Experimental Aircraft Web Site.
Recent Activity
Date
Hours
Work Log Summary
Details
05-24-2014
1.0
Left Aileron
Details
05-17-2014
1.0
Aileron Hinge Brackets
Details
03-08-2014
1.5
Aileron Hinge Brackets
Details
03-02-2014
3.0
Installed Fuel Tanks
Details
02-16-2014
2.0
Riveted Top Skins On The Left Wing
Details
09-21-2013
2.0
Bruce Helping Me Rivet The Top Skins
Details
09-18-2013
1.5
Began Riveting Top Skin On The Right Wing
Details
09-13-2013
1.0
Primed Rear Spar Rivet Holes
Details
08-25-2013
1.0
Made And Installed Pitot Tube Line
Details
08-25-2013
0.0
Made And Installed Pitot Tube Line
Details
SITE NAVIGATION
Contact Builder
CX7 Home
RV-7 Home
Category
# Logs
# Hours
All
106
392
Empennage
54
136
Wings
52
256
Copyright © 2001-2024 Matronics. All Rights Reserved.