Powered By Kitlog Pro v2.0
Dan's Web Site
Builder:
Dan Reeves
Location:
Mechanicsburg, PA - USA
Aircraft:
Van's Aircraft - RV-7A
Manufacturer:
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
2264 Hours
Welcome to my Experimental Aircraft Web Site.
Recent Activity
Date
Hours
Work Log Summary
Details
07-10-2012
0.0
XeVision HID And Balast On Duckworks Mount
Details
07-10-2012
1.0
Recharge Dessicant Plugs; Remove Lower Cowl
Details
06-01-2012
0.5
Rivet Nutplates To Ribs For Duckworks Mount
Details
06-01-2012
0.5
Match Drill Reinf Strips For Plexiglass Cover
Details
06-01-2012
0.5
Drill Rivet Holes For Nutplates Using Jig
Details
06-01-2012
0.5
Drill Ribs For Screws To Secure Duckworks Kit
Details
05-20-2012
0.5
Measure / Mark For Duckworks Cutout
Details
05-20-2012
1.0
Dremel Duckworks Cutout; Debur
Details
05-07-2012
0.5
Rivet Nutplates To Ribs For Duckworks Mount
Details
05-07-2012
0.5
Recharge Dessicant Plugs; Top Off Oil
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
1974
2363
Ailerons
35
56
Assembly
5
6
Avionics
4
4
Baffles
134
110
Big Dig
8
Brakes
23
26
Canopy
64
83
Canopy Frame
144
152
Cowl
68
74
Electrial
120
96
Electrical
120
96
Elevator
58
90
Empennage
30
48
Engine
64
42
Filtered Air Box
26
22
Finish Kit
4
4
Firewall Forward
27
24
Flaps
50
64
Forward Fuselage
44
53
Fuel System
28
36
Fuselage
294
460
Gear
32
38
Hangar
2
Hardware
5
4
Horizontal Stabilizer
42
60
Left Aileron
4
6
Left Flap
3
2
Left Fuel Tank
38
68
Left Wing
90
117
Paint
1
0
Panel
39
47
Photo Shoot
25
2
Prop
4
4
Right Aileron
2
2
Right Flap
3
2
Right Fuel Tank
43
60
Right Wing
84
102
Rudder
16
30
Rudder II
31
54
Seats
9
21
Service Bulletin: No
7
6
Spinner
17
15
Systems
1
0
Training
3
Vertical Stabilizer
23
31
Wings
100
146
Copyright © 2001-2024 Matronics. All Rights Reserved.