Total Build Time:
582 Hours

Building an RV-4. Empennage is complete, primered, and hanging on the wall. Time to complete the empennage: 150 hours. The wings are finished and stored. As of now, the fuse is in the jig, and about ready to skin. The plan is 160hp Lycoming, Catto Prop, and VFR day / night, initially. I will be doing the fastback conversion, and would like to move the canopy down and forward a bit, but I will not move/ shorten the roll bar. Deviating from the plans with the roll bar is not something I want to do, in the interest of safety.
EFIS. and interested in a nice EMS, and either a Garmin 430W or 696.

I have finally gotten this build log completely updated.
**This site is being used as a construction log, to satisfy the build requirements of the FAA**

Recent Activity
 Date Hours Work Log Summary Details
 01-20-2017
2.0
Cockpit Rails, Roll Bar, And Firewall
Details
       

 01-14-2017
3.5
Cockpit Rails, Instrument Panel, And Fwd Top Skin
Details
       

 01-11-2017
1.5
Prepped And Primed Floorboard Parts
Details
       

 01-10-2017
2.0
Deburred And Dimpled Floorboards And Stiffeners
Details
       

 01-08-2017
3.0
Fabricated Forward Floorboards/steps
Details
       

 01-07-2017
5.0
Big Day! First Day That We All Got A Chance To Sit
Details
       

 01-04-2017
1.5
Worked On Floorboards
Details
       

 01-03-2017
3.0
Worked On Floorboards, And Put Fuselage Back In Cr
Details
       

 01-02-2017
2.0
Finished Firewall Work, Worked On Spar Bulkhead An
Details
       

 01-01-2017
5.0
Worked On Front Seat, And F443 Brackets
Details
       