Powered By Kitlog Pro v2.0
Jasons Web Site
Builder:
Jason Tremble
Location:
Oregon, IL - USA
Aircraft:
Vans Aircraft - RV-7A
Manufacturer:
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
220 Hours
Welcome to my Experimental Aircraft Web Site.
Recent Activity
Date
Hours
Work Log Summary
Details
03-21-2010
5.0
Attached And Rigged Ailerons, Attached Control Sti
03-20-2010
6.0
Fabricated Fuel Tank Attach Brackets
03-19-2010
3.0
Fitted L And R Steps
03-18-2010
2.5
Cut Holes In Fuselage For Flap Linkage
03-16-2010
2.5
Drilled Holes In Fuselage To Set Wing Sweep And In
03-14-2010
2.0
Attached Wings To Fuselage For 1st Time
03-13-2010
1.0
Finished Riveting On R Wing Bottom Skin
03-12-2010
2.5
Riveted On R Wing Bottom Skin
03-10-2010
3.0
Riveted On L Wing Bottom Skin And Attached Pitot
10-10-2009
3.0
Drilled Brake Pedals To Master Cylinders
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
81
218
Empennage
47
120
Fuselage
13
42
Wings
21
56
Copyright © 2001-2024 Matronics. All Rights Reserved.