KitLog pro

Powered By Kitlog Pro v2.0

Jasons Web Site

Builder:
Jason Tremble
Location:
Oregon, IL - USA
Aircraft:
Vans Aircraft - RV-7A
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
220 Hours

Welcome to my Experimental Aircraft Web Site.

Recent Activity
 Date Hours Work Log Summary Details
 03-21-2010
5.0
Attached And Rigged Ailerons, Attached Control Sti
       

 03-20-2010
6.0
Fabricated Fuel Tank Attach Brackets
       

 03-19-2010
3.0
Fitted L And R Steps
       

 03-18-2010
2.5
Cut Holes In Fuselage For Flap Linkage
       

 03-16-2010
2.5
Drilled Holes In Fuselage To Set Wing Sweep And In
       

 03-14-2010
2.0
Attached Wings To Fuselage For 1st Time
       

 03-13-2010
1.0
Finished Riveting On R Wing Bottom Skin
     

 03-12-2010
2.5
Riveted On R Wing Bottom Skin
       

 03-10-2010
3.0
Riveted On L Wing Bottom Skin And Attached Pitot
       

 10-10-2009
3.0
Drilled Brake Pedals To Master Cylinders
       










Copyright © 2001-2024 Matronics. All Rights Reserved.