KitLog pro

Powered By Kitlog Pro v2.0

My RV-7A

Builder:
Dan Schultz
Location:
Katy, TX - USA
Aircraft:
Van's Aircraft, Inc. - RV-7A
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Textron Lycoming (Planned) - IO-360-M1B
Prop:
Hartzel (Planned) - C2YR-1BFP/F7497.74" - Fixed
Total Build Time:
255 Hours

This site will allow others to follow what I am doing in my garage. I never thought I would be building anything much less an airplane that I will actually fly. Follow along on my adventure. Good times, bad times. What a learning experience.

Recent Activity
 Date Hours Work Log Summary Details
 11-27-2011
1.5
Center Section Odds And Ends Before Mating To Tail
Details
       

 11-26-2011
1.5
Manual Aileron Trim Assembly
Details
       

 11-23-2011
1.0
Manual Aileron Trim Bracket Installation
Details
       

 11-23-2011
0.8
Manual Aileron Trim Bracket Installation
Details
       

 11-23-2011
0.5
Manual Aileron Trim Bracket Installation
Details
       

 11-23-2011
0.3
Manual Aileron Trim Bracket Installation
Details
     

 11-19-2011
1.5
Crotch Strap Bracket Installation
Details
       

 11-19-2011
3.0
Center Section - Drilling Plate Nut Holes #2
Details
     

 11-19-2011
3.0
Center Section - Drilling Plate Nut Holes #1
Details
       

 11-15-2011
1.5
Center Section - Back Drilling F-715 Rib
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.