Powered By Kitlog Pro v2.0
James Vans RV4 Project
Builder:
James MacGregor
Location:
Southampton, Ontario - Canada
Aircraft:
Vans Aircraft - RV4
Manufacturer:
http://www.vansaircraft.com/
Engine:
Lycoming - 0-360
Prop:
TBD
Total Build Time:
153 Hours
It is decidedly not a good idea to begin building a building an airplane prior to buying a new house and starting a new job...but progress as it is, this is the log for my RV-4 project.
Recent Activity
Date
Hours
Work Log Summary
Details
09-29-2008
4.5
Marking And Stiffener Preparation (left Elevator)
Details
09-28-2008
4.0
Right Elevator Stiffener Prep / Drill
Details
09-16-2008
3.3
Right Elevator Skin - Marking And Stiffeners
Details
09-16-2008
2.0
Assemble Rudder Skeleton
Details
09-15-2008
0.5
Re-assembly
Details
09-14-2008
3.0
Refabrication Of R-405
Details
08-29-2008
3.0
Rivet Stiffeners To Rudder Skin.
Details
12-09-2007
4.5
Priming And Elevator Ink Layouts
Details
12-04-2007
2.8
Metal Prep.
Details
11-24-2007
5.0
Paint Booth Etc.
Details
SITE NAVIGATION
Contact Builder
RV4 Home
Category
# Logs
# Hours
All
37
153
Empennage
35
148
Tools
1
5
Wings
1
0
Copyright © 2001-2024 Matronics. All Rights Reserved.