Powered By Kitlog Pro v2.0
Tom Aniello RV-8 Project
Builder:
Tom Aniello
Location:
Wichita, KS - USA
Aircraft:
Van's - RV-8
Manufacturer:
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
72 Hours
Welcome to my RV-8 Project Log Site
Recent Activity
Date
Hours
Work Log Summary
Details
02-18-2008
0.8
Details
10-14-2007
0.5
Finishing The Vertical Stabilizer
Details
10-14-2007
2.0
Finishing The Vertical Stabilizer
Details
10-14-2007
1.8
Finishing The Vertical Stab
Details
10-13-2007
2.0
Vertical Stabilizer Spar Doubler
Details
10-11-2007
0.0
New Spar Doubler
Details
10-07-2007
2.0
Primed Vertical Stabilizer Components
Details
10-06-2007
0.0
Drilling Lightening Holes
Details
09-29-2007
1.7
Drill Lightening Holes - Lesson Learned
Details
09-21-2007
0.7
Dimpling And Drilling
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
34
73
Empennage
27
72
Rudder
1
1
Shop Supplies
2
Training
4
Copyright © 2001-2024 Matronics. All Rights Reserved.