Powered By Kitlog Pro v2.0
CAF Carl's Aircraft Factory
Builder:
Carl Kristensen
Location:
London, ON - Canada
Aircraft:
Van's Aircraft - RV-8
Manufacturer:
http://www.vansaircraft.com/
Engine:
Lycoming - O-320
Prop:
-
Total Build Time:
69 Hours
I am building a Van's RV-8, and at this point I haven't even begun to consider paint schemes, so I have included a line drawing of the aircraft.
Recent Activity
Date
Hours
Work Log Summary
Details
04-17-2006
0.0
The Obligatory "everything Together Shot"
Details
04-17-2006
1.3
Finished Riveting VS
Details
04-16-2006
2.5
Began Riveting VS
Details
04-15-2006
1.4
Primed VS Parts
Details
04-14-2006
1.1
Ready To Prime
Details
03-30-2006
0.5
Countersunk The Stiffener And Dimpled The Spars
Details
03-29-2006
1.6
Finished Deburring Skin And Cut Lightening Holes
Details
03-26-2006
1.5
Edged And Deburred VS Parts
Details
03-22-2006
1.1
Match Drilled VS Skin And Disassembled
Details
03-21-2006
1.0
Prepped Ribs And Match Drilled Spars
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
64
69
Empennage
45
51
Miscellaneous
3
2
Tools
7
5
Training Kit
9
11
Copyright © 2001-2024 Matronics. All Rights Reserved.