Powered By Kitlog Pro v2.0
Nate's RV-7 Site
Builder:
Nathaniel Jackson
Location:
, -
Aircraft:
Van's Aircraft - RV-7
Manufacturer:
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
949 Hours
Welcome to my Experimental Aircraft Web Site.
Recent Activity
Date
Hours
Work Log Summary
Details
10-24-2021
1.0
Test
Details
10-18-2021
1.5
Trim/Shape New F-605C Doublers
Details
10-18-2021
0.5
Top Coat Crotch Strap
Details
10-17-2021
1.0
Primed Crotch Strap And Fuselage Parts
Details
10-17-2021
2.0
Match Drill F-705B/F-605C To F-705A
Details
10-16-2021
1.0
Deburing And Scuffing
Details
10-15-2021
2.0
Match Drill New Crotch Strap Parts
Details
10-14-2021
0.5
Dimpling The F-704B, Drilling F-716L
Details
10-13-2021
1.0
F-705A/B/F-605C Repair
Details
09-25-2021
2.0
Prepping Wing Skin Bottoms
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
22
1835
Empennage
1
412
Fuel Tanks
1
360
Fuselage
15
247
Wings
5
816
RV-7 Home
RV-7 Home
Copyright © 2001-2024 Matronics. All Rights Reserved.