KitLog pro

Powered By Kitlog Pro v2.0

Building N530JY

Builder:
Jeremy Seals
Location:
Goshen, KY - USA
Aircraft:
Van's - RV-10
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
58 Hours

This build log documents construction of our Van’s RV-10, beginning in the fall of 2020. We decided on this airplane as an eventual replacement for our Piper Lance, which we have owned for six years. The Lance has been a great family airplane, but owning a certified plane has only made the move an experimental aircraft more tempting. The ability to customize the plane as we build and the fact that I’ll be it’s legal maintainer led us to an RV. The fact that we don’t need a six-seat airplane anymore as our kids grow up (but still want four seats) led us to an RV-10. Building the plane will primarily be a father/son project for me and my son Ethan, who is 14 as we begin construction. Our goal is to finish it and fly before Ethan graduates from high school.



Recent Activity
 Date Hours Work Log Summary Details
 09-24-2020
2.0
Started Vert Stab
Details
       

 09-23-2020
3.0
Tool Box Practice Kit
Details
       

 09-20-2020
4.0
Control Surface Practice Kit
Details
       

 09-18-2020
3.0
Inventory
Details
       

 09-18-2020
6.0
Dimpling Table Stand
Details
     

 09-09-2020
3.0
Phone Holder
Details

 09-06-2020
12.0
Dimpling Table
Details
       

 08-28-2020
4.0
Built EAA Workbenches
Details
     

 08-27-2020
10.0
Workshop Prep
Details

 08-26-2020
10.0
Workshop Prep
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.