KitLog pro

Powered By Kitlog Pro v2.0

Edwards Web Site

Builder:
Edward Beam
Location:
Plano, TX - USA
Aircraft:
Vans - RV-14A
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Lycoming - I0-390
Prop:
Hartzell
Total Build Time:
1507 Hours

Welcome to my Experimental Aircraft Web Site.

Recent Activity
 Date Hours Work Log Summary Details
 01-04-2025
4.0
Finished Fuel Lines Between Wings And Fuselage
Details
       

 12-16-2024
3.0
Started Fuel Line Connection Between Wings And Fus
Details
       

 12-06-2024
8.0
Made The Wire/ Pitot Tube Connections At Wing Root
Details
       

 11-27-2024
6.0
Attached The Wings To The Fuselage
Details
       

 11-26-2024
6.0
Finished Up Wiring Connectors At The Wing Roots
Details
       

 11-13-2024
5.0
Fianl Assembly Of Horizontal/Vertical Stabilizers
Details
       

 11-11-2024
4.0
Started Assembly Of Some Of The Painted Parts
Details
       

 11-07-2024
4.0
Painting - Lower Cowling And Misc Parts
Details
       

 11-06-2024
4.0
Painting - Upper Cowling, Canopy
Details
       

 11-05-2024
8.0
Painting - Priming Cowling, Canopy And Other Small
Details
       










Copyright © 2001-2025 Matronics. All Rights Reserved.