KitLog pro

Powered By Kitlog Pro v2.0

RV-8 Build Log

Builder:
Andrew Caldwell
Location:
Toowoomba, QLD - Australia
Aircraft:
Vans Aircraft - RV-8
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
217 Hours

Welcome to the slow time build project of a RV-8

Recent Activity
 Date Hours Work Log Summary Details
 05-28-2022
0.5
Trim Tab Prime
Details
     

 05-27-2022
0.5
Trim Tab Prime
Details
     

 05-26-2022
0.0
Wing Kit Ordered
Details

 05-22-2022
1.0
Trim Tab Work
Details
     

 05-16-2022
2.5
Trim Tab Work - Success
Details
       

 05-15-2022
1.0
Elevator Trim Tab Prime Take Two
Details
     

 05-11-2022
1.5
Trim Tab Failure
Details
       

 05-02-2022
0.0
Left Elevator Test Fit
Details
       

 05-02-2022
2.3
Left Elevator Leading Edge & Trim Tab
Details
       

 05-01-2022
0.0
Left Elevator Assembly
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.