DOUGs Web Site

Builder:
DOUG WEHRLY
Location:
New Braunfels, TX - USA
Aircraft:
The Airplane Factory - Sling 2
Engine:
Rotax - 912 ULS
Prop:
Warp Drive - 3-Blade, 72" - Fixed
Total Build Time:
705 Hours

August 21, 2022: Update, Project Sold to a new home! Can't wait to see it flying soon.

March 25, 2018: Project Start

This is my first airplane kit that I have started building. Many moons ago I bought an early Glasair rudder kit and decided very quickly that I'm not into fiberglass, epoxy and micro balloons. Then not too long ago I bought a Sonex Waiex tail kit, and never started on it as I wasn't sure if it was the right plane for me so I sold it.

In 2015 I ran across the TAF Sling while researching kits again and decided that's my kind of airplane so I bought most of the kits for the Sling 2 (minus wings, finishing kits). It sat in the garage for 3 years as life got in the way, but now I am committed to the build and have carved out a big block of time for this project.

My rough plan is to have the plane ready for engine and avionics by May 2019. I'm really enjoying working on this kit.

Recent Activity
 Date Hours Work Log Summary Details
 12-31-2019
0.5
2 Leak Tested Static And Pitot Lines
Details
       

 12-31-2019
2.0
1 Installed Pitot And Static Lines
Details
       

 12-28-2019
2.0
Installed Radio Rack
Details
     

 12-24-2019
2.0
Assembled Radio Rack
Details
       

 12-23-2019
2.0
NAV122, Dimmers And A Panel Stand
Details
       

 12-21-2019
1.5
Installed Circuit Breakers And ELT Switch
Details
       

 12-14-2019
1.0
Instrument Lighting, Switch Caps And Static Source
Details
       

 12-08-2019
0.5
4 Installed Garmin G3X Touch
Details
       

 12-08-2019
1.0
3 Installed Toggle Switches
Details
       

 12-08-2019
1.0
2 Altimeter Lighting And Toggle Switches
Details
       