Powered By Kitlog Pro v2.0
Damiens Web Site
Builder:
Damien Currier
Location:
Maricopa, AZ - USA
Aircraft:
Vans - RV-8
Manufacturer:
http://www.vansaircraft.com/
Engine:
Lycoming - IO-360 A1A
Prop:
-
Total Build Time:
293 Hours
I have converted to the new EAA Builder Log website and will not be updating this log as of 9/25/2019. The link to my new log is: https://eaabuilderslog.org/?s=Rumblebee
Recent Activity
Date
Hours
Work Log Summary
Details
06-09-2019
2.0
Empennage Control Surfaces "final" Attach
Details
06-08-2019
2.0
Trim Motor Wiring Harness
Details
06-02-2019
2.0
Elevators - Drilling The Center Hinge Bolt Holes
Details
06-01-2019
1.0
Elevator - Trim Wire Harness Alternate Route
Details
05-26-2019
2.0
Elevators - Attach To HS And Trim
Details
05-25-2019
4.0
Trim Tab Motor - Installation, Calibration
Details
05-12-2019
3.0
Elevator - Rolling Leading Edges
Details
05-10-2019
2.0
Trim Tab - Riveting
Details
05-09-2019
2.0
Trim Tab Adjustment, Hinge Drilling
Details
05-02-2019
1.0
Wing Jig Fabrication
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
101
293
Empennage
95
286
Inventory
1
2
Shop Setup
2
2
Wings
3
3
Copyright © 2001-2024 Matronics. All Rights Reserved.