KitLog pro

Powered By Kitlog Pro v2.0

Nigel & Nicks RV-7

Builder:
Anthony Johnston
Location:
Birchgrove, NSW - Australia
Aircraft:
Vans Aircraft - RV-7
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Aero Sport Power - IO-375
Prop:
MT Propeller - MTV-9-B/183-50a - Constant Pitch
Total Build Time:
185 Hours

Welcome to my experimental aircraft Web site.

Recent Activity
 Date Hours Work Log Summary Details
 01-20-2020
2.0
Paint Scheme
Details
     

 12-23-2019
3.0
Drilling The VS Bottom Bracket - Part 2
Details
       

 11-15-2019
1.0
Question Regarding Alternative Fastening Method Ot
Details
       

 09-18-2019
6.0
FItting The Vertical Stabiliser To Fuselage
Details
       

 09-18-2019
2.0
Drilling The VS Bottom Bracket - Part 1
Details
       

 09-10-2018
2.0
Trim Tab Assembly And Priming
Details

 09-10-2018
2.0
Prime W-704-L Wing Skin
Details

 09-10-2018
1.0
Install Fuel Return Line (EFII - Bung)
Details
     

 09-10-2018
1.0
I Added Further Wires And Marked The Wires
Details
       

 08-31-2018
4.0
Preparing The Left Elevator
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.