Powered By Kitlog Pro v2.0
7MC
Builder:
Jack Hazelwood
Location:
Fort Worth, TX - USA
Aircraft:
VANS - RV7
Manufacturer:
http://www.vansaircraft.com/
Engine:
tbd -
Prop:
tbd
Total Build Time:
168 Hours
Welcome to my Experimental Aircraft Web Site.
Recent Activity
Date
Hours
Work Log Summary
Details
02-21-2015
1.0
Prep
Details
02-17-2015
4.0
Wing Kit Inventory - Unpack
Details
11-06-2014
5.3
Left Elevator
Details
11-05-2014
3.0
Left Elevator And Trim Servo
Details
11-04-2014
4.0
Elevator - Reiveting The Right Elevator
Details
11-02-2014
6.5
Elevator Debur & Dimple
Details
10-31-2014
5.8
Assemble L/R Elevators
Details
10-29-2014
4.1
Elevators And Stiffeners
Details
10-28-2014
3.8
Rudder - Done (Trailing Edge)
Details
10-24-2014
2.0
Elevator Skins
Details
SITE NAVIGATION
Contact Builder
RV7 Home
Category
# Logs
# Hours
All
41
168
Empennage
39
163
Wings
2
5
Copyright © 2001-2024 Matronics. All Rights Reserved.