KitLog pro

Powered By Kitlog Pro v2.0

Rick's RV-7A Web Site

Builder:
Richard Weiss
Location:
Port Orange, FL - USA
Aircraft:
Vans - RV-7A
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Lycoming - Thunder Bolt IO-390
Prop:
MT
Total Build Time:
3158 Hours

Welcome to my Experimental Aircraft Web Site.

Recent Activity
 Date Hours Work Log Summary Details
 03-04-2017
2.0
We Began Troubleshooting The Start Issue.
Details

 03-04-2017
2.0
Performed The Fuel Flow Tests.
Details
       

 03-04-2017
1.0
Engine Start Was Unsuccessful And The Battery Quic
Details

 03-03-2017
3.0
Boost Pump Installation Nearly Complete.
Details
       

 03-02-2017
2.0
More Fuel Pump Installation Work, Mostly Fitting A
       

 03-01-2017
3.0
Painted The Bracket And Installed The New Boost Pu
Details

 02-28-2017
3.0
Painted And Installed The Fuel Boost Pump Bracket.
Details

 02-27-2017
1.0
Began Fabrication Of The New Fuel Boost Pump Brack

 02-24-2017
1.0
Fabricated A New Fuel Line.
Details

 02-23-2017
1.0
Rewired The Fuel Boost Pump To Firewall Fwd.
       










Copyright © 2001-2024 Matronics. All Rights Reserved.