Powered By Kitlog Pro v2.0
Dans T-51 Construction Log
Builder:
Dan McCullough
Location:
West Jordan, Utah -
Aircraft:
Titan Aircraft - T-51 Mustang 3/4Scale P-51
Engine:
-
Prop:
-
Total Build Time:
133 Hours
Welcome to my experimental aircraft Web site.
Recent Activity
Date
Hours
Work Log Summary
Details
05-03-2015
6.0
Center Hat Section Riveted In Place
05-02-2015
2.0
Center Hat Section Riviting
05-01-2015
2.0
Dimpleing Center Hat Section
04-30-2015
2.0
Drilling Rivet Holes For Center Section
04-29-2015
2.0
Making Wedge Hatchanel For Canter Section #3-#4
04-28-2015
2.0
Using Sheet Metal Mutli Tool To Bend Hat Sections
04-27-2015
2.0
Making Hat Section For #3-#4 Center Section
04-26-2015
4.0
Reasemble Forward Bage Area
04-25-2015
4.0
Reasembeled Forward Bagage #2/3 To Glue Hat Chanel
04-24-2015
2.0
Refit Upper Cowling Stringer
SITE NAVIGATION
Contact Builder
T-51 Mustang 3/4Scale P-51 Home
Category
# Logs
# Hours
All
50
133
Controls
1
5
Fuselage
11
29
Fuselage - Windshiel
1
6
Fuselage aft fuel ta
1
2
Fuselage Hat Chanel
20
46
Fuselage Skins
5
12
Inventory
6
12
Landing gear
2
8
Study plans/building
2
4
Workspace
1
9
Copyright © 2001-2024 Matronics. All Rights Reserved.