KitLog pro

Powered By Kitlog Pro v2.0

Steves RV-7 Web Site

Builder:
Steve Hagler
Location:
Monroe, NC - US
Aircraft:
Vans Aircraft - RV-7
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Lycoming -
Prop:
-
Total Build Time:
165 Hours

Welcome to my experimental aircraft Web site.

This website will document my progress towards building a Vans Aircraft RV-7 for both the FAA and family or friends who might be interested.

The picture of the RV-7 in the top left was my first ride in an RV at Lancaster airport (LKR) a few years ago. It was built by Randy Utsey (EAA Ch-309). Thanks Randy.

Recent Activity
 Date Hours Work Log Summary Details
 09-10-2015
8.0
Finished Riveting The Vertical Stabilizer
Details
       

 09-09-2015
2.0
2-Rivetied VS Ribs & Spars
Details
       

 09-09-2015
6.0
1-Riveted HS Spars
Details
       

 09-08-2015
8.0
Primed The Vertical Stabilizer
Details
       

 09-06-2015
8.0
Dimpled The Vertical Stabilizer
Details
       

 09-01-2015
0.5
Wings Ordered Today
Details

 08-24-2015
2.0
Match Drilling Vertical Stabilizer
Details
       

 08-23-2015
4.0
Started On The Vertical Stabilizer
Details
       

 08-22-2015
3.0
Finished Horizontal Stabilizer
Details
       

 08-16-2015
6.0
More Riveting And Assembly
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.