Powered By Kitlog Pro v2.0
Jeremy Balentines RV-8
Builder:
Jeremy Balentine
Location:
Gilbert, AZ - USA
Aircraft:
Vans Aircraft - RV-8
Manufacturer:
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
514 Hours
Thanks for viewing my RV-8 progress.
Recent Activity
Date
Hours
Work Log Summary
Details
11-19-2014
6.0
Aileron Hinges / Flap And Aileron Gap Fairings
Details
11-14-2014
5.0
New Wing Stands
Details
11-13-2014
7.0
Flap Work / Left Top Wing Skin Riveting
Details
11-12-2014
6.0
Right Main Wing Skins / Flap Work
Details
11-11-2014
9.0
Drilling Out The Flaps And Hinge/Riveting Top Main
Details
11-09-2014
3.0
Scarf Joint On The Top Wing Skins
Details
11-08-2014
1.0
Leak Test Of The Right Tank
Details
11-02-2014
6.0
Sealing The Rear Baffle Of The Right Tank
Details
11-01-2014
1.0
Leak Test Of The Left Tank
Details
10-27-2014
6.0
Sealing The Rear Baffle Of The Left Tank
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
90
514
Empennage
28
158
Wings
62
356
Copyright © 2001-2024 Matronics. All Rights Reserved.