KitLog pro

Powered By Kitlog Pro v2.0

Jeremy Balentines RV-8

Builder:
Jeremy Balentine
Location:
Gilbert, AZ - USA
Aircraft:
Vans Aircraft - RV-8
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
514 Hours

Thanks for viewing my RV-8 progress.

Recent Activity
 Date Hours Work Log Summary Details
 11-19-2014
6.0
Aileron Hinges / Flap And Aileron Gap Fairings
Details
       

 11-14-2014
5.0
New Wing Stands
Details
       

 11-13-2014
7.0
Flap Work / Left Top Wing Skin Riveting
Details
       

 11-12-2014
6.0
Right Main Wing Skins / Flap Work
Details

 11-11-2014
9.0
Drilling Out The Flaps And Hinge/Riveting Top Main
Details
       

 11-09-2014
3.0
Scarf Joint On The Top Wing Skins
Details
       

 11-08-2014
1.0
Leak Test Of The Right Tank
Details

 11-02-2014
6.0
Sealing The Rear Baffle Of The Right Tank
Details

 11-01-2014
1.0
Leak Test Of The Left Tank
Details
     

 10-27-2014
6.0
Sealing The Rear Baffle Of The Left Tank
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.