Powered By Kitlog Pro v2.0
Bayou Bert's RV9A Web Site
Builder:
John Bertucci
Location:
, -
Aircraft:
Vans - RV9A
Manufacturer:
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
868 Hours
Welcome to my RV9A build site.
I retire in June '13 and will have the time to work on the project. I plan to go QB with fuselage and wings.
The empennage is on the way.
Time to get rolling.
Bert
Recent Activity
Date
Hours
Work Log Summary
Details
11-19-2015
0.5
First Flight
Details
07-29-2015
12.5
Airworthiness Certificate
Details
07-06-2015
10.0
Engine Run In
Details
07-03-2015
10.0
First Engine Run
Details
07-01-2015
8.0
FAA Paperwork
Details
06-22-2015
25.0
Full Inspection
Details
06-15-2015
20.0
Interior Install
Details
06-08-2015
45.0
Fuel Flow Test
Details
05-25-2015
8.0
Panel Checkout
Details
05-14-2015
10.0
Installed Flaps
Details
SITE NAVIGATION
Contact Builder
RV9A Home
Category
# Logs
# Hours
All
60
1168
Avionics
1
8
Empennage
2
46
Engine
5
86
Fuselage
6
186
Getting Started
10
122
Getting Started AGAI
3
180
Miscellaneous
11
128
None
1
0
Panel
10
122
Wings
8
110
Wiring
3
180
Copyright © 2001-2024 Matronics. All Rights Reserved.