KitLog pro

Powered By Kitlog Pro v2.0

Dave Yost RV-4

Builder:
David D. Yost
Location:
Lakeside, Ca - USA
Aircraft:
Vans Aircraft - RV-4
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
106 Hours

Welcome to my experimental aircraft Web site.

Recent Activity
 Date Hours Work Log Summary Details
 06-18-2019
1.0

Details

 11-03-2013
15.0
Rudder Structure
       

 02-03-2013
1.0
Bio: Dave Yost
Details
       

 02-02-2013
1.0
Prepairing The Elevator Bearing Bracket
Details
       

 01-30-2013
2.0
Horizontal Stab Begins!
Details
       

 08-29-2012
6.0
Final Finish On The Fiberglass Tip. Vertical Stab
Details
       

 08-29-2012
3.0
Fiberglass Tip Final Install
Details
       

 08-25-2012
8.0
VS Stab Fiberglass Tip.
Details
       

 08-21-2012
8.0
Final Assembly Of The Vertical Stab!
Details
       

 08-20-2012
4.0
Riveting Begins!
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.