KitLog pro

Powered By Kitlog Pro v2.0

Patricks Web Site

Builder:
Patrick Townsend
Location:
Battle Ground, WA - U.S.A.
Aircraft:
Vans Aircraft - RV 9
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Lycoming - 0320
Prop:
Props Inc
Total Build Time:
292 Hours

Standard Vans panel with the Vans inst. built exactly according to plans. Panel was hydrogrphicaly dipped to look like burlwood. Garmin mode C transponder. Icon radio. 65 hrs worth of work with wiring and instal

Recent Activity
 Date Hours Work Log Summary Details
 08-14-2013
4.5
Rudder Cables
Details
       

 08-05-2013
3.0
Fuel And Oil Press
Details
       

 07-30-2013
8.0
Fire Wall
Details
       

 07-29-2013
3.0
Mounted Rudder Peddals And Rudder Cable.
Details
       

 07-24-2013
5.0
Brake Lines And Electric Fuel Pump.
Details
       

 07-23-2013
4.5
Rudder Stops And VS Bolts
Details
       

 07-22-2013
5.0
Elevator Attatchment
Details
       

 07-09-2013
9.0
Tail Feathers
Details
       

 07-01-2013
4.0
Installed Wheels And Brake Pads
Details
       

 06-18-2013
3.0
Replaced Fuel Selector Valve
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.