Powered By Kitlog Pro v2.0
Vans RV6
Builder:
Jarrod Clowes
Location:
Deniliquin, NSW - Australia
Aircraft:
Vans - RV12
Manufacturer:
http://www.vansaircraft.com/
Engine:
Rotax - 912ULS
Prop:
-
Total Build Time:
60 Hours
Welcome to my Experimental Aircraft Web Site.
Recent Activity
Date
Hours
Work Log Summary
Details
03-30-2014
0.0
Wings Are Done
03-17-2014
5.0
Deburr And Polish Of Fusalage Parts
03-17-2013
2.0
Wing Tips Completed On Both Wings
03-03-2013
5.0
Clecoing And Riveting Of The Right Wing Skins
Details
02-16-2013
5.0
Nailing Up The Left Wing Skins
Details
02-09-2013
6.0
Deburred And Polished The Wing Skins
02-03-2013
0.5
Trim Tab Assembaled
02-02-2013
3.0
Ribs And Sub Spar Riveted Up
Details
01-25-2013
3.0
Spar And Ribs
Details
12-21-2012
15.0
The Nailing Up And Assembally Of The Enpennage
Details
SITE NAVIGATION
Contact Builder
RV12 Home
Category
# Logs
# Hours
All
16
851
A. Pre Planning
1
16
E. Empennage
1
210
F. Wings
8
371
G. Fuselage
1
238
Rudder
1
3
Stabilator
1
8
Vertical Stabiliser
3
5
RV6 Home
Copyright © 2001-2024 Matronics. All Rights Reserved.