KitLog pro

Powered By Kitlog Pro v2.0

Vans RV6

Builder:
Jarrod Clowes
Location:
Deniliquin, NSW - Australia
Aircraft:
Vans - RV12
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Rotax - 912ULS
Prop:
-
Total Build Time:
60 Hours

Welcome to my Experimental Aircraft Web Site.

Recent Activity
 Date Hours Work Log Summary Details
 03-30-2014
0.0
Wings Are Done
       

 03-17-2014
5.0
Deburr And Polish Of Fusalage Parts

 03-17-2013
2.0
Wing Tips Completed On Both Wings
       

 03-03-2013
5.0
Clecoing And Riveting Of The Right Wing Skins
Details
       

 02-16-2013
5.0
Nailing Up The Left Wing Skins
Details
       

 02-09-2013
6.0
Deburred And Polished The Wing Skins

 02-03-2013
0.5
Trim Tab Assembaled
       

 02-02-2013
3.0
Ribs And Sub Spar Riveted Up
Details
       

 01-25-2013
3.0
Spar And Ribs
Details
       

 12-21-2012
15.0
The Nailing Up And Assembally Of The Enpennage
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.