KitLog pro

Powered By Kitlog Pro v2.0

Dan's RV7 Build

Builder:
Dan Madson
Location:
Lancaster, CA - USA
Aircraft:
Van's Aircraft - RV-7
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
22 Hours

Welcome to my build log of my first homebuilt RV-7!

Recent Activity
 Date Hours Work Log Summary Details
 10-11-2013
3.1
Rudder Skins
Details
       

 11-09-2012
0.0
Re-Work On Horizontal Stab
Details

 10-21-2012
1.7
Right Side Horizontal Stabilizer
Details
       

 10-20-2012
4.2
Left Side Horizontal Stabilizer
Details
       

 09-15-2012
2.0
Front Spar Work
Details
       

 06-29-2012
0.0
Update
Details

 06-22-2012
0.6
HS-714 Taper Detail
Details
     

 06-20-2012
0.6
HS-714 Taper Detail
Details
       

 06-19-2012
0.4
Getting Back Into The Project.
Details

 04-28-2012
1.8
Filing And Bending
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.