|
|
|
|
RV-7A Tip-up QB build project
|
Builder:
|
Darren Oneill
|
Location:
|
Centurion, Guateng - South Africa
|
Aircraft:
|
Vans - RV-7A QB Tip-up BUILD hrs
|
Manufacturer:
|
http://www.vansaircraft.com/
|
Engine:
|
Lycoming - IO360
|
Prop:
|
Hartzell
|
Total Build Time:
|
4352 Hours
|
|
The detailed builder's logs of the RV-7A Qucikbuild, Tip-up, Build number 73718.
Centurion
South Africa
Recent Activity
Date |
Hours |
Work Log Summary
|
Details
|
03-07-2013
|
9.0
|
Canopy Frame, Fitted, Trimmed, And Assembled
|
Details
|
|
|
03-07-2013
|
2.5
|
Canopy Frame Fit, Canopy Bubble Fit, R Wing Moved
|
Details
|
|
|
03-05-2013
|
9.0
|
Canopy Frame Assembly, Corrosion Treated
|
Details
|
|
|
03-04-2013
|
7.0
|
Canopy Frame, Panel, Shroud And Canopy Work
|
Details
|
|
|
03-01-2013
|
7.5
|
Right Wing Riveting, Skins - Surface Prep
|
Details
|
|
|
02-28-2013
|
7.0
|
R Wing Riveting, Priming, Tip Heat Shielding.
|
Details
|
|
|
02-27-2013
|
10.5
|
R Wing Riveting
|
Details
|
|
|
02-26-2013
|
9.0
|
Rivet Work R Wing, Loading Of Left Wing And Parts
|
Details
|
|
|
02-25-2013
|
8.0
|
Complete L Wing Masked, Rivet Work R Wing
|
Details
|
|
|
02-22-2013
|
9.0
|
Masking And Prep Of Left Wing For Paint, Right Win
|
Details
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |