KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project

Builder:
Darren Oneill
Location:
Centurion, Guateng - South Africa
Aircraft:
Vans - RV-7A QB Tip-up BUILD hrs
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Lycoming - IO360
Prop:
Hartzell
Total Build Time:
4352 Hours

The detailed builder's logs of the RV-7A Qucikbuild, Tip-up, Build number 73718.

Centurion
South Africa

Recent Activity
 Date Hours Work Log Summary Details
 03-07-2013
9.0
Canopy Frame, Fitted, Trimmed, And Assembled
Details
       

 03-07-2013
2.5
Canopy Frame Fit, Canopy Bubble Fit, R Wing Moved
Details
       

 03-05-2013
9.0
Canopy Frame Assembly, Corrosion Treated
Details
       

 03-04-2013
7.0
Canopy Frame, Panel, Shroud And Canopy Work
Details
       

 03-01-2013
7.5
Right Wing Riveting, Skins - Surface Prep
Details
       

 02-28-2013
7.0
R Wing Riveting, Priming, Tip Heat Shielding.
Details
       

 02-27-2013
10.5
R Wing Riveting
Details
       

 02-26-2013
9.0
Rivet Work R Wing, Loading Of Left Wing And Parts
Details
       

 02-25-2013
8.0
Complete L Wing Masked, Rivet Work R Wing
Details
       

 02-22-2013
9.0
Masking And Prep Of Left Wing For Paint, Right Win
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.