KitLog pro

Powered By Kitlog Pro v2.0

PHIL'S WEB SITE

Builder:
Phil Rathje
Location:
Parker, CO - USA
Aircraft:
Van's Aircraft - RV-9
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
214 Hours

Welcome to my Experimental Aircraft Web Site.

Recent Activity
 Date Hours Work Log Summary Details
 05-26-2013
1.0
Finished Left Elevator
Details
     

 05-25-2013
0.0
Trim Tab Problem
Details

 05-24-2013
1.3
Trim Tab-Assemble/Left Elev. TE
Details
       

 05-20-2013
0.0
Trim Tab-Additional Photos From 5/20
Details
       

 05-20-2013
3.0
Trim Tab
Details
       

 05-19-2013
0.0
Trim Tab-Additional Photo From 5/19
Details
     

 05-19-2013
1.5
Trim Tab
Details
       

 05-12-2013
1.5
Completed Right Elevator
Details
     

 05-10-2013
0.5
Glued Trailing Edge-Right Elevator
Details
       

 05-09-2013
0.8
Trailing Edge-Left Elevator
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.