KitLog pro

Powered By Kitlog Pro v2.0

Bobs RV Projects

Builder:
Robert Lussow
Location:
Sunman, IN - USA
Aircraft:
Vans - RV-10
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
2834 Hours

Welcome to my RV-10 Build Log!

Recent Activity
 Date Hours Work Log Summary Details
 04-13-2026
1.0

Details

 03-28-2026
1.5
Assemble Flap Structure
Details
     

 10-11-2020
10.0
Miscellaneous Tasks
Details
       

 09-24-2020
2.0
Interior Panels
Details
       

 09-15-2020
4.0
Miscellaneous Tasks
Details
       

 09-15-2020
1.2

Details
       

 08-29-2020
6.5
Multiple Tasks
Details
     

 08-23-2020
2.0
EFII Controller Wiring
Details

 08-22-2020
2.3
EFII Controller Wiring
Details

 08-21-2020
2.5
Post First Start Tasks
Details










Copyright © 2001-2026 Matronics. All Rights Reserved.