KitLog pro

Powered By Kitlog Pro v2.0

Michaels Web Site

Builder:
Michael Matthews
Location:
Plainview, TX - USA
Aircraft:
Van's Aircraft - RV-7A
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Lycoming - IO360M1B
Prop:
Hartzel - Blended Airfoil - Constant Pitch
Total Build Time:
190 Hours

Welcome to my Van's RV-7A experimental airplane construction site. The reason for this web site is to keep friends and family up on what I am doing and to share my experience with other builders as well as document the project per FAA requirements.

Disclaimer: I have never built an airplane before so if you use this as an instructional site, you do so at your own risk.

Recent Activity
 Date Hours Work Log Summary Details
 03-28-2012
0.5
Finished Riveting Trim Tab Hinge
Details
       

 03-27-2012
0.5
Riveted Trim Tab
Details
       

 03-26-2012
0.5
Trim Tab Work
Details
       

 03-25-2012
1.0
Started Riveting Left Elevator Trim Tab
Details
       

 03-24-2012
3.5
Riveted Left Elevator Skin
Details
       

 03-22-2012
0.8
Finished Riveting Left Elevator Skeleton
Details
       

 03-18-2012
0.5
More Left Elevator Work
Details
       

 03-17-2012
0.3
Stared Riveting Left Elevator
Details
       

 03-14-2012
3.5
Primed Left Elevator Understructure
Details
       

 03-06-2012
1.5
More Trim Tab Work
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.