Powered By Kitlog Pro v2.0
Steves Web Site
Builder:
Steven Pofahl
Location:
Brookings, SD -
Aircraft:
Vans - RV8A
Manufacturer:
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
2138 Hours
Welcome to my experimental aircraft Web site.
Recent Activity
Date
Hours
Work Log Summary
Details
06-20-2016
1.5
Install Nutplates Fwd Fuse Bulkheads, Prep For Ski
01-16-2016
4.0
Final Install Wheel Pants And Fairings
Details
01-10-2016
5.0
Sanded, Filled, Primed And Clear Coated Fairings
Details
01-09-2016
8.0
Painted Wheel Pants And First Coat On Fairings
Details
01-08-2016
7.0
Sanded And Primed Wheel Pants.
Details
01-07-2016
9.0
Complete Construction Of Nose Gear Leg Fairings
01-06-2016
8.0
Complete Construction Nosewheel Pant
Details
01-05-2016
0.0
Brake Line Repair
Details
01-04-2016
5.5
Wheel Pants And Fairings Cont.
01-02-2016
5.0
Fit R Main Gear And Intersection Fairings
SITE NAVIGATION
Contact Builder
RV8A Home
Category
# Logs
# Hours
All
564
2547
Avionics / panel
38
204
Canopy
30
167
Cowl
12
78
Electrical
38
244
Empennage
69
268
Engine
33
169
Fuel System
6
39
Fuselage
62
269
Hangar
52
Miscellaneous
32
114
motorhome
7
Paint
47
257
Panel
38
204
Panel / Avionics
38
204
Shop
5
Tools
1
Wheel pants and fair
14
86
wheels / brakes
3
13
Wings
39
231
Copyright © 2001-2024 Matronics. All Rights Reserved.