KitLog pro

Powered By Kitlog Pro v2.0

Tippin's RV-10

Builder:
Michael J. Tippin
Location:
Tampa, FL - USA
Aircraft:
Van's - RV-10
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Lycoming - IO-540
Prop:
Hartzel
Total Build Time:
76 Hours

After months of shop preparation, we have started our build and just completed the vertical stabilizer.

Recent Activity
 Date Hours Work Log Summary Details
 01-22-2012
6.0
Rudder Assembly
Details
       

 01-21-2012
10.0
Riveted Vertical Stabilizer Together.
Details
       

 12-26-2011
7.0
Primed Vertical Stabilizer Parts.

 11-13-2011
5.0
Finalized Paint Booth And Dunk Tanks.
Details
       

 11-05-2011
6.0
Assembling The Portable Paint Booth.
Details
       

 05-01-2011
7.0
Practice Toolbox And Vertical Stab.
Details
       

 04-23-2011
5.0
Toolbox And Air Compressor Accessories
Details
       

 03-19-2011
7.5
Devised Our Own Inventory System While Putting The
Details
       

 03-11-2011
7.5
Empennage Arrived, Began To Unpack.
Details
       

 02-20-2011
1.5
Finished EAA Tables.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.