KitLog pro

Powered By Kitlog Pro v2.0

LAAD Avion LLC

Builder:
Dave Dick
Location:
Winona Lake, IN - USA
Aircraft:
Vans Aircraft - RV-12
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Rotax -
Prop:
-
Total Build Time:
545 Hours

Welcome to my experimental aircraft Web site.

Recent Activity
 Date Hours Work Log Summary Details
 09-29-2013
4.0
Install ADSB, Fix PTT Switch,EGT Moniter Issue
       

 05-18-2013
1.0
Its Done! Fly's Like An RV Should!
Details
       

 03-13-2013
1.0
Final Inspection By Jon Blosser DAR
Details
       

 03-12-2013
1.5
Install Data Plate, Balance Carbs, Finish Punchlis
Details
       

 03-11-2013
3.0
Pitot Static System Test, Find And Fix Static Leak
Details
       

 03-09-2013
8.0
Fix Trim, Weight And Balance, Punchlist
Details
       

 03-07-2013
3.5
Emptyl Tank, Enter HEX, Towbar,start Punchlist
Details
       

 03-03-2013
4.0
Calibrate Fuel Tank, Install Interior Light, Inter
       

 03-02-2013
3.0
Fuel In, First Start, Trim Indicator Issues...
       

 02-28-2013
3.0
Bleed Brakes, Set Up Dynon, Air In Tires, Canopy O
       










Copyright © 2001-2024 Matronics. All Rights Reserved.