Powered By Kitlog Pro v2.0
Mikes Web Site
Builder:
Mike Bourget
Location:
Orleans, Ontario - Canada
Aircraft:
Vans - RV8
Manufacturer:
http://www.vansaircraft.com/
Engine:
-
Prop:
RV-200
Total Build Time:
258 Hours
Welcome to my RV8 site,,, hopefully it will prove to be helpful.
1 Rivet at a Time
Mike
Recent Activity
Date
Hours
Work Log Summary
Details
02-26-2007
12.7
*&^9(*& Gear Legs :)
Details
01-30-2007
6.0
Canopy Frame
Details
01-29-2007
1.3
Left Elevator
Details
01-29-2007
3.8
Install Fuselage Bow (roll Bar)
Details
01-28-2007
1.8
Left Elevator
Details
01-27-2007
1.0
Mid Fuse Covers
Details
01-25-2007
1.5
Painting
Details
01-24-2007
4.5
Painting Of Roll Bar
Details
01-23-2007
1.2
Side Console Gotcha Big Time
Details
01-22-2007
4.8
Rudder Stop Install
Details
SITE NAVIGATION
Contact Builder
RV8 Home
Category
# Logs
# Hours
All
90
258
Empennage
35
86
Fuselage
32
104
Miscellaneous
14
47
Tools
1
1
Wings
8
20
Copyright © 2001-2024 Matronics. All Rights Reserved.