KitLog pro

Powered By Kitlog Pro v2.0

Mikes Web Site

Builder:
Mike Bourget
Location:
Orleans, Ontario - Canada
Aircraft:
Vans - RV8
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
RV-200
Total Build Time:
258 Hours

Welcome to my RV8 site,,, hopefully it will prove to be helpful.

1 Rivet at a Time

Mike

Recent Activity
 Date Hours Work Log Summary Details
 02-26-2007
12.7
*&^9(*& Gear Legs :)
Details

 01-30-2007
6.0
Canopy Frame
Details
       

 01-29-2007
1.3
Left Elevator
Details
       

 01-29-2007
3.8
Install Fuselage Bow (roll Bar)
Details
       

 01-28-2007
1.8
Left Elevator
Details
     

 01-27-2007
1.0
Mid Fuse Covers
Details

 01-25-2007
1.5
Painting
Details

 01-24-2007
4.5
Painting Of Roll Bar
Details
       

 01-23-2007
1.2
Side Console Gotcha Big Time
Details
       

 01-22-2007
4.8
Rudder Stop Install
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.