KitLog pro

Powered By Kitlog Pro v2.0

Jim's Web Site

Builder:
James Kinsey
Location:
Kissimmee, Fl - USA
Aircraft:
Vans - RV7A
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Lycoming - IO360A1A
Prop:
Catto
Total Build Time:
728 Hours

My project is the RV-7A slow build with a slider canopy (For taxiing on hot days). I began the plane in 2004 and now it is 2021. I would say it is definitely a slow build. Lots of interruptions through the years. The plane is finally getting ready for the DAR inspection. The plane has a full glass Advanced Flight panel, Garmin avionics and an IO360 200 hp Lycoming with a Catto three blade prop.

Recent Activity
 Date Hours Work Log Summary Details
 07-23-2007
22.0
More Multiple Day Work Pics
Details
       

 07-07-2007
28.0
Catch Up
Details
       

 06-03-2007
8.0
Joined Aft And Center Sections
Details
       

 05-28-2007
30.0
Center Section
Details
       

 04-14-2007
20.0
Tail Cone
Details
       

 03-31-2007
9.0
Small Jobs
Details
       

 03-24-2007
12.0
Tail Cone
Details
       

 03-17-2007
8.0
Stringers And Canopy Rail
Details
       

 03-10-2007
14.0
Bending The Longerons
Details
       

 02-25-2007
8.0
Deburring, Alumnipreping And Priming
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.