Date |
Hours |
Work Log Summary
 |
Details
 |
08-23-2014
|
8.0
|
Installed Primer Lines,checked And Set New Spark P
|
|
  |
|
07-01-2011
|
6.0
|
Drilled Holes In Spinner Mounting It To The Prop A
|
Details
|
|
|
06-30-2011
|
3.0
|
Mounting The Spinner To The Prop.
|
Details
|
|
|
06-30-2011
|
3.0
|
Mounted The Prop To The Aircraft.
|
Details
|
|
|
06-28-2011
|
2.0
|
Fixed The Bottom Rudder Fairing.
|
Details
|
|
|
06-26-2011
|
3.0
|
Working On Mounting The Pitot Tube.
|
Details
|
|
|
06-25-2011
|
3.0
|
Working On The Upper Cowling.
|
Details
|
|
|
06-24-2011
|
4.0
|
Moved Fusalage To Airport.
|
Details
|
|
|
06-18-2011
|
3.0
|
Started Working On The Cowling.
|
Details
|
 |
|
06-13-2011
|
1.5
|
Fitting The Light Strobe Combo In The Rudder Fairi
|
Details
|
|