KitLog pro

Powered By Kitlog Pro v2.0

Cowboy's RV-10
' style=
Date:  2-9-2010
Number of Hours:  1.00
Manual Reference:  11-5
Brief Description:  Vertical Stabilizer Installation

Step4: Bolt the Vertical Stab Attach Bracket to Hz Stab front spar.
Step5: Final Drill Vertical Stab rear spar doubler holes. C-Skin bottom two holes and install hardware called in the plans.
' style=

V Stab Attach Bracket

V Stab Attach Bracket

' style=

C-Sink and Install Hdwr

C-Sink and Install Hdwr

' style=

Starting to look like a plane.

Starting to look like a plane.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.