8-11: Step 1: Installed SB625-8 Snap Bushings into front hz stab spar. These were left out unintentionally so after tail disassembly I devised a method with a small finish nail, safety wire and masking tape to pull the snap bushings into place from front to back per the plans. I would have been easier to put them in backwards as there is a larger lightning hole to feed them through but I wanted to stay with the recommended direction in the plans. Worked better than expected.
8-13: Step 6: Installed two snap bushings from aft to forward into the rear spar per the plans.