Finished drilling the holes for the headset connectors and installed the connecters. They are not wired yet, I am just checking spacing. I could have placed them closer together, but I chose not to do so. The third hole is for the power connector for our ANR headsets.
Also fitted the baggage comparment light. The panel pictured covers the bottom of the support member that runs from the roll bar aft to the baggage compartment bulkhead (F-706.) I made this cover some time ago and knew I was going to install a light. Finally getting around to it. I need to mount a small switch forward of the light.