KitLog pro

Powered By Kitlog Pro v2.0

Bob Leffler's RV-10
' style=
Date:  9-25-2011
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Started fuselage electrical

Brad assisted me in pulling a #2 cable from the rear to the firewall. We crimped a lug on the cable. I also installed the starter selenoid on the firewall to ensure there is no conflict with the power pass through.
' style=

Power pass through on the aft side of the firewall

Power pass through on the aft side of the firewall

' style=

Starter Selenoid

Starter Selenoid

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.